Installation of a MAGALDI ash removal system

… in Rotterdam Complete dismantling and assembly of an asphalt mixing plant in Spandau. We specialize in the following work: repairs, adjustments, calibration of rotary kilns, drying drums and grinding plants including maintenance and repair of bearings Replacement of mechanical plating and wear linings Maintenance, calibration and alignment of all auxiliary units Conveying equipment (mechanical/pneumatic) […]

Installation of a silo

… in Wilhelmshafen Complete dismantling and assembly of an asphalt mixing plant in Spandau. We specialize in the following work: repairs, adjustments, calibration of rotary kilns, drying drums and grinding plants including maintenance and repair of bearings Replacement of mechanical plating and wear linings Maintenance, calibration and alignment of all auxiliary units Conveying equipment (mechanical/pneumatic) […]

Installation of evaporative cooler

… in Salzgitter Complete assembly of an evaporation cooler for Salzgitter Flachstahl GmbH. We specialize in the following work: Repairs, adjustment, calibration of rotary kilns, drying drums and grinding plants Including maintenance and repair of bearings Replacement of mechanical plating and wear linings Maintenance, calibration and alignment of all auxiliary units Conveying equipment (mechanical/pneumatic) such […]

Disassembly and assembly of asphalt mixing plant

… in Spandau Complete dismantling and assembly of an asphalt mixing plant in Spandau. We specialize in the following work: repairs, adjustments, calibration of rotary kilns, drying drums and grinding plants including maintenance and repair of bearings Replacement of mechanical plating and wear linings Maintenance, calibration and alignment of all auxiliary units Conveying equipment (mechanical/pneumatic) […]

Assembly of a rotary cement kiln

… at the Wössingen cement plant Assembly of a rotary cement kiln DRO 3.800, LAFARGE cement plant WössingenPeriod of assembly: August 2008 until February 2009Contractor LAFARGE Zement GmbH, KarsdorfRebuilding of the 56m long kiln line 3 under very cramped assembly circumstancesAssembly via 2x 500 to. truck-mounted cranesWelding of the seams at the site carried out […]

Dismantling of an oven-race-section DEUNA

… Replacement of a kiln barrel ring weft Replacement race-section with race in rotary kiln 1, station 2       Client:                                  DYCKERHOFF Deuna Zement GmbHConstruction site:              Cement mill DeunaPeriod of Assembly:         25.01.2010 – 17.02.2010 The works included the dismantling of the race-section with race as well as […]

Cement kiln gear rim replacement

… Replacement of a cement kiln gear rim shot Replacement of the gear rim course with gear rim and pinion shaft at rotary kiln no. 3       Client:                       LAFARGE Zement Karsdorf GmbHConstruction site:  Cement mill KarsdorfAssembly time:      18.01.2010 – 10.02.2010 The works contained the disassembly of the gear rim course with gear rim        Replacement […]

Cement mill bulk head exchange

Exchange of bulkhead in a cement mill Replacement of the bulk-head in cement mill ZM8 and rotating of the gear rimConstruction site:       Werk Mannersdorf, Österreich.Client:                           LAFARGE Perlmooser GmbHPeriod of Assembly:  January 2010 – February 2010 Client LAFARGE Perlmooser GmbH MannersdorfReplacement of the bulk-head (approx. […]

Repair of a cement kiln DEUNA

… Assembly of a complete cement kiln Assembly of a cement rotary kiln DRO 3.800Construction site:  Werk LAFARGE Zementwerk WössingenAssembly time:       August 2008 – Februar 2009Client:                       LAFARGE Zement GmbH, Karsdorf Rebuild of the oven line no. 3, length approx. 56m under very […]

Installation of a new galvanizing plant

… in Linz, Austria 2007 Installation of the galvanizing plant FVZ4 in the factory of VA Stahl in Linz, AustriaClient SUNDWIG GmbHPeriod of assembly: May 2006 until January 2007, including commissioning Assembly of the mechanics approximately 2.000 to. additionally the loop memory for the company KLAAS SIEMENS approximatly 400 to. steelworkInstallation works in day- and […]