Replacement of a Weir Barrel
… in Wieblingen near Heidelberg in 2008 WSM has replaced the weir barrl in Wieblingen in the year 2008.The replacement was realized by 10 employees in 14 days.
Flood gate replacement of the Sluice in Venhaus
… in 2009 Because of the decade-long assignment at assemblies of machinery in several domains, our experts possess a secured experience in repairs and reconstructions at machines and systems, for example Steel-Water-Works. The gates have been changed within a period of 14 days with twelve workers of WSM.
Flood gate exchange of the Sluice in Bamberg
… in 2010 Because of the decade-long assignment at assemblies of machinery in several domains, our experts possess a secured experience in repairs and reconstructions at machines and systems, for example Steel-Water-Works. The gates have been changed within a period of 14 days with twenty workers of WSM.
Replacement of Floodgates of the Sluice in Leerstätten
… in 2010 Because of the decade-long assignment at assemblies of machinery in several domains, our experts possess a secured experience in repairs and reconstructions at machines and systems, for example Steel-Water-Works. The gates have been changed within a period of 14 days with 30 workers of WSM.