MESSER Industriemontagen und Apparatebau GmbH

References

Industriemontagen & Apparatebau GmbH - English

Renewal of an extraction system

… over a length of approx. 370m In 2023, we planned, manufactured and installed the extraction pipeline for a Möller building for the steelworks in

Weiterlesen »
Industriemontagen & Apparatebau GmbH - English

Stirring vessel for Wintershall

approx. ø3.2m x approx. 5.6m In 2022, we manufactured and installed an agitator vessel for the K+S site “Wintershall” (in Heringen). The vessel has a

Weiterlesen »
Industriemontagen & Apparatebau GmbH - English

Crystalliser for Wintershall

ø2.6m x approx. 11.2m In 2022, we manufactured and installed a crystallizer for the K+S site “Wintershall” (in Heringen). The apparatus has a diameter of

Weiterlesen »
Industriemontagen & Apparatebau GmbH - English

Pipeline installation for K+S

approx. 640m pipeline DN250 In 2021, we delivered and installed an approx. 640m long steel pipeline for the K+S site “Hattorf” (in Philippsthal). The pipeline

Weiterlesen »
Industriemontagen & Apparatebau GmbH - English

Intzetanks for K+S

… with ø13.0 x 14.0 m each made of steel with steel structure In the years 2020 – 2022, we manufactured a total of seven

Weiterlesen »
Industriemontagen & Apparatebau GmbH - English

Torchheads Bremen

… with ø2.0 x 6.5 m each made of stainless steel with steel structure In 2019, we manufactured four new flare heads for the blast

Weiterlesen »