Assembly of an ash cooler

… in the power plant in Walsum 2009

Assembly of a MAGALDI – Ash-removal plant

Client:                             HITACHI Power Europe GmbH
Construction site:         Kraftwerk Walsum
Period of Assembly:     24.08.2009 – 26.02.2010


The works included the assembly of the MAGALDI ash-removal plant beneath the boiler plus the removal and intercalation of the ash next to the boiler house.