MESSER-GROUP

Sitemap
Pages
Posts
- Manufacuring and Erection of special apparatus
- Welding technique
- MESSER was certified according to DIN ISO 9001:2015
- MESSER Personalservice GmbH re-certified according to SCP
- WSM take-over as of January 1st 2010
- Safety trophy for MESSER
- Detours to the Main river
- Triple the workforce is still not enough
- Workforce tripled
- Messer’s flexible personnel reserve
- Another bath for Bad Hersfeld
- Safety seal of quality for MESSER
- MESSER is training again
- A new colleague every third day
- CDU visit at MESSER
- Steel girders for a birthday
- A thank you for strong men
- Restart with a black zero
- Michael Klebsch takes over traditional Heringen company
- The MESSER company is saved!
- Production of two storage containers
- Renewal of an extraction system
- Stirring vessel for Wintershall
- Crystalliser for Wintershall
- Pipeline installation for K+S
- Partial renewal of a drying drum
- Flat-bottom tanks for K+S
- Intzetanks for K+S
- Torchheads Bremen
- Production of vaporiser with peripherals
- Production of vaporisers with a diameter of up to 6.8m
- Production of mixing vessels up to 5.8m diameter
- Installation of a MAGALDI ash removal system
- Installation of a silo
- Installation of evaporative cooler
- Disassembly and assembly of asphalt mixing plant
- Assembly of a rotary cement kiln
- Transpositioning of industrial plants, e.g. asphalt merge facilities
- Installation and inspection of a land rig
- Repair and transpositioning of a sand recovery plant
- Assembly of asphalt merge facilities
- Assembly of carbon dust silos
- Assembly of an ash cooler
- Cement kiln shot replacement
- Dismantling of an oven-race-section DEUNA
- Repair of a cement kiln DEUNA
- Cement kiln gear rim replacement
- Cement mill bulk head exchange
- Cement mill bulk head exchange
- Repair of a cement kiln DEUNA
- Cement kiln gear rim replacement
- Dismantling of an oven-race-section DEUNA
- Assemblies and reconstructions
- Installation of a new galvanizing plant
- Installation of a new galvanizing plant
- Installation of the secondary dust removal system
- Assembly of 3 slag silos
- Installation of a steel converter
- Installation of a steel converter
- Installation of a new exhaust gas line
- Installation of 5 tandem trestles
- Replacement of a Weir Barrel
- Assembly of a weir barrel
- Flood gate replacement of the Sluice in Venhaus
- Flood gate exchange of the Sluice in Bamberg
- Flood gate exchange Bamberg
- Replacement of Floodgates of the Sluice in Leerstätten
- Drum dryer disassembly and transport
- Drum dryer disassembly
- Manufacture of heat exchangers
- Installation of a drying plant for gypsum boards
- Production of dissolver
- Production of adsorbers
- Assembly of hot clarifier
- Production of evaporative cooler Wintershall
- Manufacturing of a start-up flash-tank
- Production of evaporative coolers Salzgitter
- Production of a desocolumn
- Pipeline construction references
- Grinding of races
- Installation of drum internals
- Repair of drum dryers
- Assembly
- Installation of vessels and equipment
- Assembly of open tanks
- Assembly of steam generator
- Assembly of fluidised bed boiler
- Planning and detail engineering
- Powerful technology and know-how
- E-Filter revisions
- Manufacturing a desocolumn
- Manufacture of stator parts
- Production of drum drive
- Special machine building parts
- Manufacturing of a start-up flash-tank
- Manufacturing of vessels
- Rotary kilns and dryers
- Fabrication of pipelines
- Fabrication heat exchanger Solvay
- Manufacturing of pressure vessels
- Fabrication silos