WSM MESSER Spezialmontagen GmbH

_WSM_logo

Dismantling of an oven-race-section DEUNA

… Replacement of a kiln barrel ring weft

Replacement race-section with race in rotary kiln 1, station 2       
Client:                                  DYCKERHOFF Deuna Zement GmbH
Construction site:              Cement mill Deuna
Period of Assembly:         25.01.2010 – 17.02.2010
Replacement race-section with race in rotary kiln 1, station 2       
Client:                                  DYCKERHOFF Deuna Zement GmbH
Construction site:              Cement mill Deuna
Period of Assembly:         25.01.2010 – 17.02.2010

The works included the dismantling of the race-section with race as well as the assembly of the new race section and race
To move the 95 to. heavy race-section we utilized a 500 to. truck-mounted crane       
The welding of the assembly seam was carried out by submerged arc tractor (Type A2TF ESAB)     

We are specialized for the following works:

  • Repairs, calibration, measurement at rotary kilns, drying drum and grinding sites
  • including servicing and repair
  • Replacement of mechanical wear coating
  • Maintenance, measurement and adjustment of all ancillary units
  • Hoisting device (mechanical/pneumatical) like bucket conveyors, scrapers and haulage conveyors
  • Dust removal sites including the appendant pipework systems
  • Loosening systems, pick off-attachment and site clearing systems
  • Wastewater renovation sites
  • Industry filters of mechanic and electrostatic building type