Dismantling of an oven-race-section DEUNA
… Replacement of a kiln barrel ring weft
Replacement race-section with race in rotary kiln 1, station 2
Client: DYCKERHOFF Deuna Zement GmbH
Construction site: Cement mill Deuna
Period of Assembly: 25.01.2010 – 17.02.2010
Replacement race-section with race in rotary kiln 1, station 2
Client: DYCKERHOFF Deuna Zement GmbH
Construction site: Cement mill Deuna
Period of Assembly: 25.01.2010 – 17.02.2010
The works included the dismantling of the race-section with race as well as the assembly of the new race section and race
To move the 95 to. heavy race-section we utilized a 500 to. truck-mounted crane
The welding of the assembly seam was carried out by submerged arc tractor (Type A2TF ESAB)
We are specialized for the following works:
- Repairs, calibration, measurement at rotary kilns, drying drum and grinding sites
- including servicing and repair
- Replacement of mechanical wear coating
- Maintenance, measurement and adjustment of all ancillary units
- Hoisting device (mechanical/pneumatical) like bucket conveyors, scrapers and haulage conveyors
- Dust removal sites including the appendant pipework systems
- Loosening systems, pick off-attachment and site clearing systems
- Wastewater renovation sites
- Industry filters of mechanic and electrostatic building type