MESSER Industriemontagen und Apparatebau GmbH

Pipeline installation for K+S

approx. 640m pipeline DN250

In 2021, we delivered and installed an approx. 640m long steel pipeline for the K+S site “Hattorf” (in Philippsthal). The pipeline has a diameter of 273mm and a wall thickness of 10mm. The pipeline was only connected with flanges in a few places and therefore had to be welded on site in a constrained position for the most part. A total of approx. 190 weld seams were produced.

Order: 107143

Year: 2021

Scope: Pipeline installation of approx. 640m pipeline DN250

Total tonnage: 44 tons