Installation of a MAGALDI ash removal system
… in Rotterdam Complete dismantling and assembly of an asphalt mixing plant in Spandau. We specialize in the following work: repairs, adjustments, calibration of rotary kilns, drying drums and grinding plants including maintenance and repair of bearings Replacement of mechanical plating and wear linings Maintenance, calibration and alignment of all auxiliary units Conveying equipment (mechanical/pneumatic) […]
Installation of a silo
… in Wilhelmshafen Complete dismantling and assembly of an asphalt mixing plant in Spandau. We specialize in the following work: repairs, adjustments, calibration of rotary kilns, drying drums and grinding plants including maintenance and repair of bearings Replacement of mechanical plating and wear linings Maintenance, calibration and alignment of all auxiliary units Conveying equipment (mechanical/pneumatic) […]
Installation of evaporative cooler
… in Salzgitter Complete assembly of an evaporation cooler for Salzgitter Flachstahl GmbH. We specialize in the following work: Repairs, adjustment, calibration of rotary kilns, drying drums and grinding plants Including maintenance and repair of bearings Replacement of mechanical plating and wear linings Maintenance, calibration and alignment of all auxiliary units Conveying equipment (mechanical/pneumatic) such […]
Disassembly and assembly of asphalt mixing plant
… in Spandau Complete dismantling and assembly of an asphalt mixing plant in Spandau. We specialize in the following work: repairs, adjustments, calibration of rotary kilns, drying drums and grinding plants including maintenance and repair of bearings Replacement of mechanical plating and wear linings Maintenance, calibration and alignment of all auxiliary units Conveying equipment (mechanical/pneumatic) […]
Assembly of a rotary cement kiln
… at the Wössingen cement plant Assembly of a rotary cement kiln DRO 3.800, LAFARGE cement plant WössingenPeriod of assembly: August 2008 until February 2009Contractor LAFARGE Zement GmbH, KarsdorfRebuilding of the 56m long kiln line 3 under very cramped assembly circumstancesAssembly via 2x 500 to. truck-mounted cranesWelding of the seams at the site carried out […]
Transpositioning of industrial plants, e.g. asphalt merge facilities
… Assembly of asphalt mixing plant Winterberg in spring 2010 We undertake the repairs and the maintenance as well as the transpositioning of buildings of every kind. Over the years we have assembled 15 batching plants or implemented. Our scope of services ranges from dismantling the plant to the transport to the new site, the […]
Installation and inspection of a land rig
… in Bad Bentheim, 2007 We undertake the repairs and the maintenance as well as the transpositioning of buildings of every kind.
Repair and transpositioning of a sand recovery plant
… at Berlin Schönefeld Airport We undertake the repairs and the maintenance as well as the transpositioning of buildings of every kind.
Assembly of asphalt merge facilities
… some examples We undertake the repairs and the maintenance as well as the transpositioning of buildings of every kind. Over the years we have assembled 15 batching plants or implemented. Our scope of services ranges from dismantling the plant to the transport to the new site, the complete mechanical and electrical installation to commissioning […]
Assembly of carbon dust silos
… in the power plant “Schwarze Pumpe” 2006 Assembly of two carbon dust silos Client: AJO – tec GmbHConstruction site: Power plant “Schwarze Pumpe”Period of assembly: April until August 2006 The silos with an aperture of 8,00m and a height of […]