Assembly of a weir barrel

… in Wieblingen near Heidelberg, 2008 WSM replaced the weir barrel in Wieblingen in the year 2008. The reconstructions were carried out with 10 workers within 14 days.
Flood gate replacement of the Sluice in Venhaus

… in 2009 Because of the decade-long assignment at assemblies of machinery in several domains, our experts possess a secured experience in repairs and reconstructions at machines and systems, for example Steel-Water-Works. The gates have been changed within a period of 14 days with twelve workers of WSM.
Flood gate exchange of the Sluice in Bamberg

… in 2010 Because of the decade-long assignment at assemblies of machinery in several domains, our experts possess a secured experience in repairs and reconstructions at machines and systems, for example Steel-Water-Works. The gates have been changed within a period of 14 days with twenty workers of WSM.
Flood gate exchange Bamberg

… Replacement of Floodgates 2010 in Bamberg By the long lasting employment during assembly of equipment in varying domains, our technical staff comes with secured know-how at repairs and reconstruction of machinery and systems, e.g. at steel-water-works.In march/april 2010 the sluice in Bamberg was equipped with new gates on behalf of and lead-managed by the […]
Replacement of Floodgates of the Sluice in Leerstätten

… in 2010 Because of the decade-long assignment at assemblies of machinery in several domains, our experts possess a secured experience in repairs and reconstructions at machines and systems, for example Steel-Water-Works. The gates have been changed within a period of 14 days with 30 workers of WSM.