Assembly of carbon dust silos

… in the power plant “Schwarze Pumpe” 2006 Assembly of two carbon dust silos Client:                                  AJO – tec GmbHConstruction site:             Power plant “Schwarze Pumpe”Period of assembly:         April until August 2006 The silos with an aperture of 8,00m and a height of […]

Assembly of an ash cooler

… in the power plant in Walsum 2009 Assembly of a MAGALDI – Ash-removal plant Client:                             HITACHI Power Europe GmbHConstruction site:         Kraftwerk WalsumPeriod of Assembly:     24.08.2009 – 26.02.2010 The works included the assembly of the MAGALDI ash-removal plant beneath the boiler plus the removal and intercalation of the ash next to the boiler house.